Recent Projects

Client: UNICEF South Sudan


Upgrading to Bitumen Standards of Galkayo North and South Roads
The Gudelle II Water distribution Project aims to expand water supply coverage of the ongoing UNICEF water supply project in Juba to benefit residents of areas where there is currently no piped water supply. The project entails consultancy services for Feasibility Study and Detailed Engineering design, including environmental and social safeguarding for the extension of water supply from Jebel Hill Reservoir to the Gudelle II area of Juba, South Sudan, and Construction supervision and contract management activities for the construction of the same. This will improve the access to water by the locals and reduce the reliance on water bowsers within the area. It will also provide safe water for usage within the families and reduce the distances covered by locals to access clean water.
- Blandit fugit dicta quibusdam, maxime tempor
- Blandit fugit dicta quibusdam, maxime tempor
- Blandit fugit dicta quibusdam, maxime tempor
Client: United Nations Offices at Nairobi (UNON)

Repair and Rehabilitation of the Oxidation Ponds
UNON intended to rehabilitate the existing oxidation ponds in order to sustain the ever-growing number of staff and visitors within the complex. One primary aim of the project is improving operational efficiency of the ponds by increasing retention time of each pond hence better treatment of waste water which is re-used to irrigate the green landscape within the Complex. The construction methodology works ensured that existing services supply are not interrupted.
The works involved included the removal and disposal of the sewage waste, Re-shaping, deepening, compacting and grading the sides and bottom of the ponds and Installation of new Geotextile, HDPE liners and HDPE baffles.
- Design for rerouting of waste water from the existing system to the newly constructed system
- Installation of ten (10) under sink grease traps for the existing kitchens


Client: Somalia Stability Fund (SSF)

Warsheikh District Project
SSF intended to provide water to the residents of Warsheikh town. LFE was contracted to undertake a hydrogeological survey for a borehole and design and construction supervision of a water supply system powered by solar energy, structural designs in water tanks, generator house, animal troughs, and water kiosk.
- Hydrogeological Survey
- Project Management
- Construction Supervision

Sewage Upgrade; United Nations Offices Nairobi
Designing and building a new septic tank and a pumping chamber that would be able to serve the growing number of staff and visitors within the United Nations Offices at Nairobi. One primary aim of the project is to improve the operational efficiency of the septic tanks within the complex and hence enhance waste management. Construction works ensured no disturbance or interruptions to the existing systems.
Image Gallery
Specific Assignment undertaken by the Firm
- Design for rerouting of waste water from the existing system to the newly constructed system.
- Design and construction of gravity sewer lines
- Design and construction of pumping sewer line
- Design and installation of new by-pass manholes.
- Design and installation of a new reinforced concrete septic tank
- Design and installation of a concrete pump chamber with a pitch and a submersible pump to exhaust water in case of flood. The chamber shall be provided with an over flood remote control.
- Design and installation of a pumping system to lift the wastewater from the outlet of the new septic tank up to a 20-metre head.
- Installation of one (1) wastewater meters to monitor the wastewater consumption.
- Installation of ten (10) under sink grease traps for the existing kitchens.
- Repair of existing septic tanks

Warsheikh District Project
To provide technical support and carry out geotechnical and geophysical investigations at proposed dam sites and to develop detailed designs for the proposed dams based the consultant’s experience and on the macro and micro studies to be made available by MoEWT.
Specific Assignment undertaken by the Firm
- Review and evaluate preliminary studies on sand, weir and sub-surface dam locations proposed by the Macro study and taking into account the lessons described in the Micro study.
- Carryout soil investigation with a vicinity of dam site to locate suitable material for dam construction.
- Detailed dam design and water supply system
La Femme Engineering Services Ltd